Introduction
Manual MLCP
Manual MLCPs account for much higher building cost as compared to the automated MLCPs. Also, the cost of ventilating systems, security personnel etc. to be borne by the developer. In the case of manual MLCPs, the car is to be driven in and parked in available slots. Waiting period may be limited to payments to the cashier as against loading and unloading of passengers as in automated system.
Multi floor parking type‐circulation
After entering the vehicle in the parking garage, the parking system is designed to move the vehicles vertically with elevators on each end. The garage consists of several levels where the vehicles are moved horizontally which rotate the pallets in conjunction with the elevators.. The multi floor circulation type is suitable for small and mid‐sized buildings because of its high space efficiency.
Advantages:
With eight times the space efficiency of a ramped garage, this system can use the narrow basement spaces to its maximum capacity.
Up to six levels can be equipped with this new technology.
With the adoption of the high speed lifting mechanism, the elevating speed has become very quick, thereby significantly shortening the time required for entering and leaving.
With the upper entrance design, it is convenient because the built‐in turntable allows for easy entry and exit.
Location Site
The project area is located at Kalol Ta. Kalol Dist. Gandhinagar
About Kalol
Kalol is a city and a municipality in Gandhinagar district in the Indian state of Gujarat.
Geography:
Kalol is located at 22.6° N 73.45° E. It has an average elevation of 100 metres (328 feet).
Kalol is located at 22.6° N 73.45° E. It has an average elevation of 100 metres (328 feet).
Demographics:
As of 2001 India censusGRIndia, Kalol had a population of 100,021. Males constitute 53% of the population and females 47%. Kalol has an average literacy rate of 75%, higher than the national average of 59.5%: male literacy is 80%, and female literacy is 69%. In Kalol, 12% of the population is under 6 years of age.
Raw Material Study
There are mainly civil, mechanical, engineering , electrical work carried out for developing the this multilevel car parking facility. This each category of the work demands different types of the raw materials like the civil work include the laying of the foundation for the parking facility and in this work raw materials like cement, concrete, iron rods , sand etc are required. These materials are easily available in the local market of the kalol. There are numbers of the construction material suppliers available in the local market.
In case of the mechanical work and engineering work , different types of activities are carried out like creation of the selves for the parking and in this work raw materials like steel frame, welding machine, different types of the nut-bolts required. So here in this case only some types of nut-bolts and steel frame are not available in the local market so they are purchased from the ahmedabad or chattral because there are numbers of engineering parts manufacturing industries are there in both those places.
In case of the electrical work different electrical components for the lighting facility are required and they all are easily available in the local market and in case of ventilation system various types of materials are required that are also available in the local market.
Demand Study
For ensuring the whether there is demand for the multilevel parking facility , observation of the current parking facility and average numbers parked are identified as follows
Average numbers of Four wheelers parked = 20
Average numbers of Two wheelers parked = 30
There is no parking facility available for all those vehicles so people park their vehicles nearby the road wherever they find the space so there is also traffic problem and insecurity of the vehicles parked is there so if there is parking facility developed then people have benefit out of it so there is obvious demand for the parking facility.
Technical Study
This parking facility requires 1500 sq. ft . space. There are 4 selves and in each shelf is having capacity of 10 vehicles. First two selves for the four wheelers and remaining shelves are for the two wheelers. Between two shelves 4 M distance is there.
The parking system is permitted cars with the following criteria
Max length – 4.8 M
Max Height – 2.0 M
Max Width – 1.9 M
Max Weight - 2500 kg
Time Estimates
Laying Foundation = 15 days
Construction work = 30 days
Raw material purchase = 15 days
Mechanical work = 15 days
Electrical work = 10 days
Other works = 15 days
Total duration for the completion of the project work is 100 days.
Project Capital Cost Estimates and Sources of Finance
Expenditures
|
Amount (Rs.)
|
Cost of the land
Civil work ( laying foundation, construction of building)
Mechanical system
Electrical system
Ventilating system
Cost of personnel (5laborers@ 2500 Rs/month) for 12 months
|
2,00,000
1,50,000
50,000
10,000
5,000
1,50,000
|
Total
|
5,65,000
|
Sources of Finance
The external source of finance for the project is Bank loan @ 10% and it is 30% of the total capital cost.
5,65,000 * 30/100 = 1,69,500 Rs
Remaining part of the finance is obtained from the internal source.
Projected Revenue
Duration of Parking (hrs)
|
Parking Charges for Four
Wheelers (Rs.)
|
Parking Charges for Two
Wheelers (Rs.)
|
8.00 – 12.00
|
40
|
20
|
5.00 - 8.00
|
30
|
15
|
Min 5.00
|
20
|
10
|
Here, assumption is made that 20% of average numbers of vehicles are parked for more than 8 hours and from remaining 80% vehicles, 50% vehicles parked for 5-8 hours and 50% vehicles parked for min 5 hours. so revenue is calculated accordingly.
Here another assumption made is that parking charges increase as the inflation rate increases year by year at 5%. Salvage value at the end of the 5 year is zero.
Revenue
For the first year
20% vehicles parked for more than 8 hours so parking charges for them are 40 and 20 Rs for four and two wheelers respectively.
So revenue of it is 5* 40 = 200 Rs/day for four wheelers and 5*20 = 100 Rs/day for two wheelers. So total revenue for 20% is 300 Rs/day
Now from remaining 80% vehicles 50% parked for 5-8 hours and 50% parked for min 5 hours.
Revenue from first 50% vehicles is as follows
10 * 30 = 300 Rs/day for four wheelers
10 * 15 = 150 Rs/day for two wheelers
So total revenue for these 20 vehicles is 450 Rs/day
Revenue from second 50% vehicles is as follows
10 * 20 = 200 Rs/day for four wheelers
10 * 10 = 100 Rs/day for two wheelers
So total revenue for these 20 vehicles is 300 Rs/day
So finally total revenue generated out of all 50 vehicles is 1050 Rs/day
Monthly revenue is 30 * 1050 = 31,500 Rs
Yearly revenue is 12 * 31500 = 3, 78,000 Rs for 1st year
For second year 4,15,800 rs
For third year 4,57,380 Rs
For fourth year 5,03,118 Rs
For fifth year 5,53,430 Rs
Year-1
|
Year-2
|
Year-3
|
Year-4
|
Year-5
| ||
1
|
Total revenue
|
3,78,000
|
4,15,800
|
4,57,380
|
5,03,118
|
5,53,430
|
2
|
Expenditure
|
2,15,000
|
2,36,500
|
2,60,150
|
2,86,165
|
3,14,782
|
3
|
EBDIT
|
1,63,000
|
1,79,300
|
1,97,230
|
2,16,953
|
2,38,648
|
4
|
Depreciation
|
15,000
|
15,000
|
15,000
|
15,000
|
15,000
|
5
|
Interest
|
16,950
|
16,950
|
16,950
|
16,950
|
16,950
|
6
|
PBT
|
131050
|
147350
|
165280
|
185003
|
206698
|
7
|
Tax (5%)
|
6553
|
7368
|
8264
|
9250
|
10335
|
8
|
Net profit
|
124497
|
139982
|
157016
|
175753
|
196363
|
Cash Inflow
Year
|
Cash inflow (Rs.)
|
1
|
1,24,497
|
2
|
1,39,982
|
3
|
1,57,016
|
4
|
1,75,753
|
5
|
1,96,363
|
Profitability analysis
Pay Back period
Year
|
Cash inflow (Rs.)
|
Pay back period(year)
| |
Actual
|
Needed
| ||
1
|
1,24,497
|
1,24,497
|
1
|
2
|
1,39,982
|
1,39,982
|
2
|
3
|
1,57,016
|
1,57,016
|
3
|
4
|
1,75,753
|
1,43,505
|
0.9
|
5
|
1,96,363
| ||
Payback period for this project is 3 years and 9.9 months
Conclusion
This project is having good net cash inflow per year and less payback period so it is profitable to implement it. This project implementation also very much helpful to the society also that solve the traffic and parking problem for them and also security problem for their vehicles also.